地址:北京市朝陽區(qū)建國路88號現(xiàn)代城A座1507
電話:010-85897625
010-85890316
傳真:010-85897625
Email:hx@bjhxjz.com
一,消防工程
Fire engineering
大多數(shù)寫字樓辦公室裝修時都要做隔斷,如果隔斷要到頂部的時候,就要進行煙感和噴淋的改動,而物業(yè)公司通常都要求業(yè)主或者裝修公司自行去解決,如果這樣的話就要找有那些有資質(zhì)的消防公司,消防公司按照規(guī)定還要報批當(dāng)?shù)叵谰诌M行審批,這個時間通常10~15天。(有的寫字樓物業(yè)部也可以解決消防問題的)
Most office buildings are to be cut off, if the time interval to to the top, will change to smoke and spray, and property companies usually require owners or the decoration company to solve, if so to find the qualified fire fire company, the company in accordance with the provisions and approval the local fire department for approval, this time is usually 10~15 days. (some office property department can also solve the problem of fire)
二,中央空調(diào)
Two, central air conditioning
同樣還是在寫字樓辦公室裝修中需要隔斷來劃分空間,那么就要考慮到每個空間都要保留一定數(shù)量的中央空調(diào)出風(fēng)口與回風(fēng)口,這樣一來同樣還需要找有正規(guī)資質(zhì)的中央空調(diào)安裝公司。在辦公室裝修改造前一定要先把中央空調(diào)改造平面布置圖交與物業(yè)公司審核。工程完工后物業(yè)公司還要求出示一份中央空調(diào)工程竣工圖。
In the same office decoration to partition to divide the space, then into account each space to retain the central air-conditioning air outlet and the air return quantity, so that the same need to find a regular qualified central air conditioning installation company. Decoration in the office before the transformation of the central air conditioning must first plan to hand in the layout of the property company and the audit. After the completion of the project, the property company also asked to produce a central air conditioning project completed.
三,強弱電
Three, strong and weak electricity
強弱電工程是寫字樓辦公室裝修工程中最主要的一點,因為它關(guān)系著整個公司的正常工作,所以也不能忽視。首先也是要找專業(yè)有資質(zhì)的綜合布線公司,由專業(yè)技術(shù)人員到現(xiàn)場進行實際測量,把強弱電的預(yù)留開關(guān),插座以及各種線路走向全部體現(xiàn)規(guī)劃到圖紙上,然后交與物業(yè)公司審核。
Strong and weak electricity engineering office decoration works in the most important point, because it is related to the normal work of the entire company, so it can not be ignored. The first is to find a professional qualified cabling company, professional and technical personnel to the scene of the actual measurement, the reserve of strength of electric switches, sockets and a variety of lines to reflect the planning drawings, and then submitted to the audit and the property company.
四,辦公家具
Four, office furniture
辦公家具在寫字樓辦公室裝修前要先找好家具公司,因為大多數(shù)辦公室都需要辦公高隔斷,很多線路,插座都要與隔斷相連接的,所以家具公司一定要與電器工程師有個緊密的銜接,圖紙最好要先由這兩方共同確定完后才要拿到物業(yè)公司審核的。
Office furniture in the office decoration before trying to find a good furniture company, because most office needs office high partition, many lines, the socket should be connected with the partition, so the furniture company must have a close connection with the electrical engineer, drawing the best from the two parties jointly determined after to get the property company audit.
五、裝修公司的選擇
Five, the choice of decoration company
設(shè)計的好壞;四個字:圖紙戰(zhàn)爭。但要忠告各位老板的是,現(xiàn)在的科技太先進了,就拿電腦效果圖來說吧,有時候圖紙上的東西往往會比現(xiàn)實的好十幾二十倍。我想電腦效果圖只能是顯示一個3d方式的理解而已,并不能認(rèn)為那就是裝修后的效果。設(shè)計的好壞還需從設(shè)計風(fēng)格是否合意、圖紙設(shè)計是否合理等來理解。
Design is good or bad; four words: drawing war. But the advice to you boss is that the technology is so advanced, with computer renderings of it, sometimes drawing things tend to two times better than reality. I think the computer can only show the effect of a 3D way of understanding it, and can not think that it is the effect of decoration. Design is good or bad from the design style is desirable, drawings and design is reasonable, and so to understand.
六、
Six,
施工質(zhì)量;參觀對方樣板房的質(zhì)量。按現(xiàn)在的情況下,似乎兩種樣板房才能反映出施工方的水平:家居裝修和酒店裝修。因為只有這兩種裝修的質(zhì)量才比較能看出水平。
Construction quality; visit the quality of the other model room. According to the present situation, it seems that the two model room to reflect the level of the construction side: home decoration and hotel decoration. Because only the quality of these two can be seen in the quality of the level of.
七、
Seven,
造價的高低;最痛苦的一項選擇。優(yōu)質(zhì)廉價固定好,但這個在現(xiàn)實邏輯上往往是不存在的。造價是質(zhì)量的第一保證。如果是資金允許,似乎選擇信譽好的施工隊會減少你很多的不必要的麻煩。
The high and low cost; the most painful choice. High quality and cheap fixed, but this is often not in the reality of logic. Cost is the first guarantee of quality. If funds allow, the construction team will choose a good reputation to save you a lot of unnecessary trouble.
八、
Eight,
付款方式。這個問題似乎是老大難的問題。一般私人裝修無論大小,施工隊都是十分愿意承接的。這主要是風(fēng)險小,但對于公司裝修來說,裝修隊都抱十分謹(jǐn)慎的態(tài)度。這只要是收款十分困難。再加上這幾年的工程詐騙事件,同行們已變得很清醒了,不會輕易受高回報的引誘而上當(dāng)。
Payment method。 This problem seems to be difficult. General private decoration, regardless of size, the construction team are very willing to undertake. This is mainly a small risk, but for the company's decoration, decoration team are very cautious attitude. As long as this is the collection is very difficult. Coupled with the project fraud in the last few years, the peer has become very clear, not easily lured by high returns.
上一篇:寫字樓裝修預(yù)算需要怎樣制定?Office decoration budget how to develop? 下一篇:寫字樓裝修如何利用好空間?Office decoration how to make good use of space?友情鏈接:北京辦公室裝修 北京辦公室設(shè)計 北京寫字樓裝修 武漢裝修 裝修資訊網(wǎng) 軟膜天花 北京seo優(yōu)化 防偽標(biāo)簽 消防車價格 淄博網(wǎng)站建設(shè) 龜紋石 袋式過濾器 短信群發(fā)軟件 大閘蟹禮券 北京餐廳設(shè)計 綠化草坪 隔音房 PPP項目全流程服務(wù) 商業(yè)計劃書 木屋別墅 論文發(fā)表 短信群發(fā) 群發(fā)短信 工商代辦 鋼骨架輕型網(wǎng)架板 群發(fā)短信 石家莊消防驗收 熱風(fēng)幕 不銹鋼板網(wǎng)